Owner’s Role:

  • Owner hires THG to assist in defining the project’s parameters, location, budget and schedule before the project begins.

Summary

  • Preliminary planning & estimating
  • Scheduling
  • Value-engineering
  • Life-cycle costing
  • Constructability reviews

Owner’s Role:

  • Owner hires an architect and THG at the start of the design process
  • Owner manages two contracts – one with the architect and one with THG

Summary:

  • Early knowledge of total project cost, before design work is completed, at reduced initial investment. Builder input during design, ongoing budgeting and value-engineering
  • Well-suited for fast-track projects
  • Collaborative relationship between architect and builder
  • Approximately 85% of project is competitively bid
  • Owner may participate in subcontractor selection
  • Owner warrants architect’s work
  • Construction management fee established at beginning of project

Owner’s Role:

  • Owner hires an architect to design the project and delivers completed plans and specifications to THG for pricing
  • The owner manages two contracts – one with the architect and one with THG

Summary:

  • Selection of builder is objective and based on completed design
  • Total project cost unknown until design is complete and all design fees expended
  • Difficult to value-engineer after design is complete
  • Owner warrants architect’s work
  • Potential for adversarial relationships – because THG is not controlling the design. Architect can design a building where inefficiencies may occur

Owner’s Role:

  • Owner hires THG, who is responsible for both design and construction of the project
  • Owner manages just one contract

Summary:

  • Early insight of total project cost, before design work is completed, at reduced initial investment
  • Builder input during design, ongoing budgeting, and value-engineering
  • Reduced change-order potential
  • Single entity responsible for design and construction
  • Collaborative relationship between architect and builder
  • Approximately 85% of project is competitively bid
  • Owner may participate in subcontractor selection
  • Design-Builder’s fee established at beginning of project
  • More efficient process, typically resulting in quicker delivery and reduced costs